| Description | Calculation | Amount |
|---|---|---|
| Fee for stimulus of privileged consumers | 1,177.86 kWh × 0.816 | 961.13 RSD |
| Access to the system for distribution of electricity/Granted power | 30.00 kW × 121.79 | 3,653.70 RSD |
| Access to the system for distribution of electricity/Active | 1,177.86 kWh × 1.666 | 1,962.31 RSD |
| Consumed electricity | 1,177.86 kWh × 14.15 | 16,666.72 RSD |
| Subtotal (before excise tax) | Sum of items 1-4 | 23,243.86 RSD |
| Excise tax (7.5%) | 23,243.86 RSD × 7.5% | 1,743.29 RSD |
| TOTAL TO PAY | Sum of all items | 24,987.15 RSD |
| Meter | Meter Total (kWh) | Tenant Allocation % | Allocated to Tenant (kWh) | Of Tenant Total |
|---|---|---|---|---|
|
S-6.3
|
834.45 | 66.66% | 556.24 | 47.22% |
|
K-5.1
|
1,386.49 | 28.97% | 401.67 | 34.10% |
|
P2/DB-5F-2
|
18.58 | 100.00% | 18.58 | 1.58% |
|
P3/DB-5F-3
|
1.47 | 100.00% | 1.47 | 0.12% |
|
P2/DBA-5F-2
|
124.24 | 100.00% | 124.24 | 10.55% |
|
P3/DBA-5F-3
|
75.66 | 100.00% | 75.66 | 6.42% |
| Total Allocated to Tenant | 1,177.86 kWh | = 100% | ||
Note: Shown allocations reflect any custom period reduction, so their sum may differ from the bill's base meter allocations.
This bill was generated on April 03, 2026 p.m.30 15:29 by the Chinese Cultural Center Electricity Management System.